PROJECT KSP02
Crab ship - processor "Arktur" type
Purpose:
• Kamchatka and Snow crab harvesting by traps of cone, trapezoid and rectan-gle types;
• processing of caught crab into boiled-frozen products with subsequent storage in the hold;
• storage of finished product in cargo hold and transshipment at sea to refrig-erating transport vessels moored along-side with the help of cargo booms by "on phone" method at sea state up to 5.
|
Name |
Shipyard, building number |
Keel laying date |
Launching date |
Delivery date |
Arktur |
OZATA Shipyard (Yalova, Turkey) |
|
|
30.03.21 |
Azimut |
OZATA Shipyard (Yalova, Turkey) |
|
|
17.07.21 |
Neptun |
OZATA Shipyard (Yalova, Turkey) |
|
|
15.11.21 |
# |
Name |
Value |
1. |
Main dimension |
Length overall, m |
73.40 |
Length between PP, m |
64.00 |
Breadth, m |
16.60 |
Depth to the main deck, m |
7.60 |
L x B x H |
73.40 x 16.60 x 7.60 = 9 260 |
2. |
Draught, m |
5.90 |
3. |
Deadweight, t |
2548 |
4. |
Endurance (about), days |
35 |
5. |
Range, nautical miles |
6000 |
6. |
Capacity of the crab processing complex, t/day: |
snow crab (processing / finished frozen products) |
30 / 20 |
king crab (processing / finished frozen products) |
60 / 40 |
7. |
Freezer cargo hold capacity (about), m³ |
1750 |
8. |
Capacity of the receiving storage bunker for live sorted crab, m³ |
52 |
9. |
Cargo-handling equipments (lifting capacity x boom): |
deck crane |
0.99 t x 12 m |
2 deck cranes |
1.0 t x 20 m, 3.0 t x 11 m |
10. |
2 stern booms loading / unloading (not greater than) |
0.99 t each |
11. |
Russian Maritime Register of Shipping class |
KM AUT1 (REF) BWM(T) PMS TMS Fishing vessel |
12. |
ME power, kW |
2 x 2400 |
13. |
Rudder and propeller complex |
2 CPP + rudders |
14. |
Bow thruster, kW |
2 x 588 |
15. |
Auxiliary engines: |
diesel-generators, kW |
1 x 277 + 1 x 410 |
shaft generator, kW |
1300 |
16. |
Crew and plant personnel, pers |
40 |
17. |
Speed (design), knots |
12 |
|