News of our company


Archive of news
 
16.02.21 01:17
Nantong Chang Qing Sha Shipyard has launched the DCB24 project, a 6.896-tonne, a shallow single-hold barge for heavy bulk cargoes



Nantong Chang Qing Sha Shipyard (China) launched on 30 January 2021 the DCB24 project (construction number 1905) shallow single-hold heavy lift barge with deadweight of 6.896 tonnes. The keel of the barge was laid down on September 28, 2020.
 
The shipyard is building two dry cargo barges of the DCB24 project.
 
The DCB24 project is a seaworthy non-self-propelled bilge vessel with a single cargo hold, with transom bow and stern ends.
 
Main dimensions of the DCB24 project dry cargo barge:
 
Maximum length - 123.80 m;
Hull length - 123.60 m;
Overall width - 24.20 m;
Width - 24.00 m;
Board height - 5.00 m;
Draft - 2.90 m.
 
A 72 m long, 12.0 m wide, 5.227 cubic meter capacity 'box' cargo hold, closed with sliding hatch closures.
 
The intensity of the distributed load on the second bottom is 10.0 tons per square meter. The height of the double bottom in the area of the cargo hold is 1000 mm. The width of the double sides is 6000 mm.
 
Deadweight at 2.90 m draft (in river) - 6688 tons.
 
Deadweight at 2.90 m draft (at sea) - 6896 tons.
 
The vessel has 7 main watertight bulkheads dividing the hull into 8 impermeable compartments. The deck, bottom and second bottom in the cargo area are of the longitudinal set system, the outboard, second side and extremities are of the transverse set system. The transverse spacing is 600 mm. The longitudinal set spacing is 430-500 mm.
 
A windlass is installed in the bow for anchor and mooring operations.
 
There is a 50 kW diesel generator (for opening - closing the hatch covers and the windlass).
 
The DCB24 project vessel is equipped with two bow anchors of 1195 kg each.
 
Keel of the DCB24 lead vessel (building No. 1905) was laid down on 28.09.2020. She was launched on 30.01.2021.
Keel of the second vessel (building No. 1906) was laid down on 28.09.2020.