PROJECT RST26
4560 DWT bunkering - product tanker for raid supply of vessels
Purpose - raid bunkering of vessels with fuel with a flash-point >60°C, supply of vessels. Transportation of petroleum products without restriction of temperature of flash-point, as well as vegetable oils, molasses and wine materials.
|
Name |
Shipyard, building number |
Keel laying date |
Launching date |
Delivery date |
Gloster 1 |
Kherson Shipyard |
22.07.11 |
22.02.13 |
16.11.13 |
|
Kherson Shipyard |
22.07.11 |
|
|
# |
Name |
Value |
1. |
Main dimension |
Length overall, m |
118.87 |
Length between PP, m |
115.26 |
Breadth overall, m |
13.24 |
Breadth scantlings, m |
13.00 |
Depth, m |
5.80 |
L x B x H |
118.87 x 13.24 x 5.80 = 9 129 |
Air draft from BL to an upper edge of non-removable parts (not greater than), m |
17.20 |
2. |
Draught (in sea (at SWL) / in river), m |
4.784 / 3.60 |
3. |
Deadweight (in sea / in river), t |
4560 / 2787 |
4. |
Endurance, days |
12 |
5. |
Number of tanks (cargo / slop) |
10 (8 / 2) |
6. |
Cargo carrying capacity (including slop tanks), m³ |
5009 |
7. |
Cargo pumps, m³/h |
2 x 450 |
8. |
Ballast tanks capacity, m³ |
1950 |
9. |
Russian River Register class |
M-SP 3,5 A |
10. |
ME power, kW |
2 x 567 |
11. |
Bow thruster, kW |
75 |
12. |
Auxiliary engines: |
diesel-generators, kW |
3 x 150 |
emergency diesel-generator, kW |
1 x 75 |
13. |
Thermal boilers: |
1 x 1.5 t/h + 1 x 0.63 t/h |
14. |
Crew / berth, pers. |
12 / 16 |
15. |
Speed (about), knots |
10.0 |
|