PROJECT CV03
Raid transshipment complex with a crane lifting capacity 35 tons and a hold with a capacity of 4600 cubic meters
| |
|
Purpose - loading, storage and unloading of bulk cargo.
|
| |
| Name |
Shipyard, building number |
Keel laying date |
Launching date |
Delivery date |
| Luft 1 |
Beshiktash shipyard (Yalova, Turkey), 81 |
12.01.18 |
19.05.18 |
19.06.18 |
| Luft 2 |
Beshiktash shipyard (Yalova, Turkey), 82 |
19.03.18 |
02.04.19 |
24.05.19 |
| # |
Name |
Value |
| 1. |
Main dimension |
| Length overall, m |
63.86 |
| Hull length, m |
63.65 |
| Length of RMRS rules, m |
61.104 |
| Breadth overall (about), m |
24.21 |
| Breadth, m |
24.00 |
| Depth, m |
7.20 |
| L x B x H |
63.86 x 24.21 x 7.20 = 11 132 |
| 2. |
Draught DWL (project) (γ = 1.025 t/m³), m |
5.60 |
| 3. |
Deadweight at DWL draught (γ = 1.025 t/m³), m |
6980 |
| 4. |
Endurance, days |
20 |
| 5. |
Cargo hold capacity (about), m³ |
4607 |
| 6. |
Crane lifting capacity |
35 t (with boom of 12-30 m) 30 t (with boom of 12-36 m) |
| 7. |
Russian maritime Register of Shipping class |
KE R3 Crane vessel |
| 8. |
Power of DG No.1, kW |
2 x 900 |
| 9. |
Power of DG No.2, kW |
1 x 160 |
| 10. |
Crew and staff, pers. |
21 |
|
| |
|