PROJECT WSB01
300 KW support vessel
|
Purpose: - provision of offshore oil and gas facilities with small freight, towing operations, transportation of organized groups of workers.
The vessel will provide the following operation:
• towage of non-self-propelled vessels and floating structures;
• escorting vessels in the port water area and mooring;
• participation in extinguishing fires at facilities;
• transportation of industrial personnel (12 people) to fixed offshore platforms;
• transportation of deck cargo weighing up to 5 tons.
|
|
Name |
Shipyard, building number |
Keel laying date |
Launching date |
Delivery date |
|
Zikh ship-repair shipyard, 1547-1 |
03.12.18 |
|
|
|
Zikh ship-repair shipyard, 1547-2 |
20.12.18 |
|
|
|
Zikh ship-repair shipyard, 1547-3 |
08.01.19 |
|
|
|
Zikh ship-repair shipyard, 1547-4 |
|
|
|
|
Zikh ship-repair shipyard, 1547-5 |
|
|
|
|
Zikh ship-repair shipyard, 1547-6 |
|
|
|
# |
Name |
Value |
1. |
Main dimension |
Length overall, m |
26.00 |
Length between PP, m |
25.00 |
Breadth, m |
6.60 |
Depth, m |
3.00 |
L x B x H |
26.00 x 6.60 x 3.00 = 515 |
2. |
Draught, m |
1.60 |
3. |
Endurance, days |
3 |
4. |
Range, nautical miles |
860 |
5. |
Towing force of hook, t |
5 |
6. |
Accommodation of industrial personnel |
salon with 12 semi-soft seats |
7. |
Tanks capacities of general stores, m³ |
fuel oil |
6.00 |
fresh water |
1.00 |
wash water |
1.50 |
8. |
Russian maritime Register of Shipping class |
KM R3 Tug |
9. |
ME power, kW |
1 x 313 |
10. |
Rudder and propellers complex |
1 FPP in rotated nozzle |
11. |
Crew / Industrial personnel, pers. |
6 / 12 |
12. |
Speed, knots |
10.0 |
13. |
Towng speed, knots |
8.0 |
|
|
|